![]() ![]() Operation of the Canadian was transferred to Via Rail in 1978, which switched over to CNR's Newmarket Subdivision, rejoining the former CPR route at Parry Sound, 23 mi (37 km) north of MacTier. Between 19 the MacTier Subdivision hosted CPR's premier transcontinental passenger train, the Canadian, from Toronto to Vancouver. The route is single-track in its entirety and hosts only freight rail service. The MacTier Subdivision is the easternmost section of Canadian Pacific's present-day transcontinental route and is the railway's only connection between its eastern and western holdings which is fully within Canada. The line stretches 126.9 mi (204.2 km) from Toronto in the south to MacTier in northern Muskoka. The MacTier Subdivision is a major rail line in Ontario, Canada, which is owned and operated by the Canadian Pacific Railway. ![]() A northbound Canadian Pacific freight train at New Tecumseth, just north of Toronto.ġ,435 mm ( 4 ft 8 + 1⁄ 2 in) standard gauge ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |